Main content
Sorry, this episode is not currently available

New series chronicling the redevelopment of St Pancras station. In episode two, the tracks must be moved from the East to the West side of the station over a single weekend.

The redeveloped St Pancras station sits at the end of a massive 5.8 billion pound railway line - the first major British line to be built for over a century. This series tells the story of the architects, engineers and spin doctors who entered the frantic two-year race to complete the project on time. The tracks entering St Pancras must be moved from the East to the West side of the station over the course of a single weekend.

30 minutes

Broadcasts