Engineers proud of 'state-of-the-art' bridge
The new 拢1.35bn Queensferry Crossing could still be operating in over 120 years, according to its technical director.
Mike Glover, who has managed the bridge project for the decade since it was first approved, told the 大象传媒 its design would make it easy to maintain.
The new 1.7 miles (2.7km) crossing over the river Forth will open to traffic for the first time on Wednesday.
It will take most of the vehicles that currently travel over the 53-year-old Forth Road Bridge.
The existing suspension bridge will be adapted to be used by lighter traffic such as cycles, pedestrians and public transport.
Duration:
This clip is from
More clips from Scotland
-
'An interest in antiques is a form of therapy'
Duration: 00:40
-
Only Child stars on how life imitates art
Duration: 01:28
-
Humpback whale tangled in Loch Fyne freed
Duration: 00:35
-
How Scotland's first fire brigade inspired the world
Duration: 01:14