Main content

鈥楥ould take weeks鈥 to re-open flooded A421

Martin Fellows, Regional Director of National Highways, says it鈥檚 鈥渆xtremely difficult鈥. This follows sustained heavy rainfall over several days with parts of Bedfordshire having their wettest month ever recorded. The water even submerged the pumping station on the A421 which was designed to stop the carriageway from flooding. Interviewed by Andy Collins. Picture: Steve Hubbard/大象传媒.

Release date:

Duration:

5 minutes