Hard engineering management involves using artificial structures, such as dams and embankments. Soft engineering management is a more natural approach to manage flooding, such as flood plain zoning.
A hydrographA graph to show how a river responds to a period of rainfall. shows how a river responds to a period of rainfall.
Peak dischargeThe volume of water in a river passing a point in a given time. Measured in cumecs (cubic metres per second). - maximum amount of water held in the channel (measured in cumecs).
Peak rainfall - maximum amount of rainfall (mm).
Lag time - the time taken between peak rainfall and peak discharge.
Rising limb - shows the increase in discharge on a hydrograph.
Falling limb - shows the return of discharge to normal/base flow on a hydrograph.
Base flow - the normal discharge of the river.
The lag time can be short or long depending on different factors. For example, if there is no vegetation in an area, the water runs off into the river quicker, therefore it would have a short lag time. Alternatively, if there is plenty of vegetation in the area, the lag time would be longer as the plants would interceptionWhen trees and plants stop water from reaching the surface. the rainfall. A shorrt lag time means water is reaching the river quickly, so there is a greater chance of a flood.