Although
the work was carried out by hand the initial digging was done
by a drill.
The
external construction of the tunnel.
Work
on the sides of the tunnel being carried out.
The
tunnel is actually circular although when you drive through
it appears to be only semi-circular. This is because a tram
line was originally going to occupy the bottom half of the tunnel.